Overview
The Dudley Street Stormwater Upgrade project for Gold Coast City Council, is part of a series of planned upgrades to the stormwater system in the Dudley St catchment of Mermaid Beach. Council required major stormwater upgrade works to improve flood protection for roads and property around Dudley St, east and west of the Gold Coast Hwy. The project sites were located in and around a congested section of the Gold Coast Hwy within a State controlled road corridor along the highway as required for the construction of the 3rd stage of the Gold Coast Light Rail project currently being built by the John Holland.
Timing for the stormwater upgrade works was critical, with John Holland providing Council a short window of opportunity to define, design and procure the works from the market. Council engaged Rob Carr through a swift Expression of Interest process, where Rob Carr later assisted Council throughout the design phase. Rob Carr collaborated extensively with Council’s project management and design team to ensure the feasibility of the design and construction given the tight working corridors and low cover between the pipeline, existing services and importantly the road surface. Shafts had to be intricately located and constructed between a quagmire of existing underground and overhead services, yet meet council battery limits and connection points without fail.
Rob Carr constructed the new DN1800 reinforced concrete drainage pipeline through saturated sands and PFAS contaminated soils beneath the Gold Coast Hwy. Apart from the challenge of completing the line during a short window of opportunity, the line was constructed between Atlantic Ave and Dudley St with only 2m of cover, using slurry pressure balanced microtunnelling to ensure accuracy of installation, significantly reduce disruption for residents and businesses and provide surety of construction of a major pipeline without damage to existing infrastructure.
Related
Similar projects
Do you have a project?
Rob Carr operates throughout
Australia and New Zealand…
…through multiple offices in
Sydney, Brisbane, Perth and Christchurch.

You have a project?
Rob Carr widely operates in
Australia and New-Zealand…
…through multiple offices in
Sydney, Brisbane, Perth and Auckland.